Construction methods include a structural steel frame, full height external glazing, fabric roof, external copper cladding, internal timber wall panelling, and curved bulkheads to box out the mechanical and electrical services.
The build only construction contract was awarded with only a couple of sketches in existence. This project was therefore the ultimate example of fast tracked construction with only two months preparation time before site possession. The project was completed and handed over 12 days ahead of programme and under budget.